Corporate Office · case study
Vantage Workplace Refresh
An activity-based working refresh for a design practice, balancing focus, collaboration and brand expression.
- Client
- Vantage Architects
- Location
- Perth, WA
- Year
- 2024
Project overview
- Industry
- Corporate Office
- Location
- Perth, WA
- Project size
- Single floor · 220 staff
- Furniture scope
- Single floor · 220 staff · ABW settings
- Completion time
- 3-week install
- Delivery method
- Custom-manufactured in-house, single-phase install
The challenge
Vantage wanted to convert a traditional floorplate into an activity-based workplace with a mix of focus, collaboration and social settings that reflected their own design brand.
Our solution
- Co-developed bespoke joinery and settings with the in-house design team.
- Custom-manufactured signature pieces to express the practice's brand.
- Installed in a single phase over three weeks with minimal disruption.
Products supplied
Furniture manufactured and supplied for this project.
Services:Workspace SolutionsCustom Furniture ManufacturingFurniture Installation
Installation process
Delivered and installed by our own teams.
- 01
Single-phase install completed over three weeks
- 02
Bespoke settings assembled and placed on site
- 03
Minimal disruption to the live design studio




OutcomesMarcus Lyell — Director, Vantage Architects
The result
- 0
- Staff accommodated
- 0+
- Bespoke settings
- 0-week
- Single-phase install
“They translated our concept into beautifully made, hard-working furniture — exactly as drawn.”
Sample case study shown as an example. Replace with your verified project, metrics and client approval before publishing.
Have a similar project in mind?
Send us your drawings, BOQ or brief and we'll scope a comparable furniture package.