Corporate Office · case study
Harbourside Corporate HQ
A full-floor workplace rollout for a national professional-services firm, delivered to a fixed move-in date.
- Client
- Atlas Property Group
- Location
- Sydney, NSW
- Year
- 2025
Project overview
- Industry
- Corporate Office
- Location
- Sydney, NSW
- Project size
- 12 floors · ~8,400 m²
- Furniture scope
- 12 floors · 1,200 workstations · 40 meeting spaces
- Completion time
- 6-week staged install
- Delivery method
- Manufactured in-house, delivered and installed by SYL teams
The challenge
Atlas needed to consolidate three offices into a single harbourside tower without disrupting a live trading floor — and to a non-negotiable occupancy date driven by the head-lease.
Our solution
- Worked directly from the designer's drawings and finishes schedule to specify benching, ergonomic seating and acoustic zoning.
- Manufactured in-house to compress lead times and lock pricing against a fixed budget.
- Delivered and installed across a staged, after-hours programme to keep the floor operational throughout.
Products supplied
Furniture manufactured and supplied for this project.
Services:Office Furniture SupplyWorkspace SolutionsFurniture Installation
Installation process
Delivered and installed by our own teams.
- 01
Staged, after-hours delivery to keep the trading floor live throughout
- 02
Assembly and precise placement to the designer's set-out
- 03
Per-floor snagging, cleaning and handover sign-off




OutcomesRebecca Hollis — Principal, Studio North
The result
- 0
- Workstations delivered
- 0-week
- Install completed
- 0
- Defects at handover
“SYL specified to our drawings exactly and hit a brutal install programme without a single defect.”